Jan 08, 2020
The first two blogs introduced eight main features of continuous lead extruders. This blog will introduce the features of the remaining main components (take the YQL-Φ100 / 5 continuous lead extruder as an example): 9. Rear Water Cooling System It consists of cooling water spraying pipe and subsequent spraying pipe for stainless steel laundry, which can make the second cooling for the crystallizat...
view more
-
Sep 22, 2020
It was reported by CCTV1 that production technology for large and length submarine cable has made a new breakthrough in Baosheng shares Co. Ltd , Congratulations on the successful delivery of the first large length 220 kv optoelectronic composite submarine cable! Which produced by ITO-SIN continuous lead extruder. Excellent !!!!
view more
-
Oct 16, 2020
Maintenance and cleaning instructions for Continuous lead extruder 1. After half a year of normal operation of the equipment, the host should be cleaned and inspected, because a small amount of oxide will adhere to the screw. Try to squeeze out the lead in the fuselage and lead pipe before the equipment is inspected and cleaned. For this reason, the lead valve should be closed in advance to allow ...
view more
-
Dec 11, 2020
1 The temperature that the following parts should reach before starting up: 1.1 Mould base 2RT1——295℃ 2RT2——290℃ 1.2 Extruded lead cylinder 2RT3——300~320℃ (Pure lead 310℃) 2RT4——320~330℃ (pure lead 330℃) 1.3 Lead pipe 2RT6, 2RT5——340~380℃ 1.4 18t lead melting furnace and 10t purification and holding furnace——360~380℃ 2 Check whether the water flow of the machine head cooling system is unblocked, s...
view more