• Sep 29, 2020

    Continuous Lead Extruder Machine maintenance Instructions

    Continuous Lead Extruder Machine maintenance Instructions 1. After the Lead Extruder Machine is installed and tested, the thermocouple should be inspected every two weeks. If its performance has not changed after three inspections, the inspection period can be extended. The thermocouple is an important executive element of the temperature measuring and controlling instrument of this Lead Wire...
    view more
  • Oct 28, 2020

    Installation and use of lead pipe

    The lead pipe is used for the lead connection between the lead melting furnace and the main engine or the lead melting furnace. When the lead liquid is transported, the temperature of the pipe is 360~380℃. When the lead melting furnace and the lead pipe are heated, the metal lead pipe will expand due to heat. For this reason, the lead pipe is designed into a " Ω" shape. Electric heating capacity o...
    view more
< 1 2

a total of2 pages

leave a message
welcome to ito-sin
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

home

products

about

contact